![[personal profile]](https://www.dreamwidth.org/img/silk/identity/user.png)
State of the condo:
- Floors are done
- Plumbing leak is repaired (finally! by replacing parts they probably should have replaced the first day!) and master bathroom is ready to be tiled.
- Bed is set up. The bed is somehow bigger than I expected.
- I have internet access, and am posting this from there. Whee!
However, sitting in this little folding chair with the laptop on my lap is making my back hurt, so I better not go on at length.
(Part of me thinks I should spend an hour or so putting another coat of sealant on the kitchen floor tile grout. However, between the tired and the back hurty, I believe I shall just head back to the hotel and collapse instead.)
Will update with photographic evidence shortly...
- Floors are done
- Plumbing leak is repaired (finally! by replacing parts they probably should have replaced the first day!) and master bathroom is ready to be tiled.
- Bed is set up. The bed is somehow bigger than I expected.
- I have internet access, and am posting this from there. Whee!
However, sitting in this little folding chair with the laptop on my lap is making my back hurt, so I better not go on at length.
(Part of me thinks I should spend an hour or so putting another coat of sealant on the kitchen floor tile grout. However, between the tired and the back hurty, I believe I shall just head back to the hotel and collapse instead.)
Will update with photographic evidence shortly...